Key factors affecting the implementation of integrated project delivery for sustainable construction

  • YEAR
    2023
  • AUTHORS
    Asad, Saad Bin
    Purushothaman, Mahesh Babu
    Poshdar, Mani
  • CATEGORIES
    2023 Conference Papers
    Conference Papers

Extract

Abstract: Integrated Project Delivery (IPD) is an approach that integrates people, systems, business structures, and practices into a process that collaboratively utilises the skills and opinions of all project participants to enhance sustainability through waste reduction. IPD aims to minimise waste in construction projects, improving sustainability, health and safety, cost, schedule, and quality and address the trust issues in the construction industry by attempting to promote a positive collaboration based on mutual respect. Though numerous literatures are available on IPD, an in-depth analysis of the barriers to IPD has never been conducted. This study addresses this research gap and aims to present the barriers to IPD in detail. A systematic literature review (SLR) was conducted using four databases and key publishers- Scopus, Emerald, ScienceDirect and International Group for Lean Construction using the keywords “integrated project delivery” and “challenges”. Additional searches using synonyms such as “barriers” and “obstacles” were conducted; the keywords yielding the highest results were selected, and every paper was examined to identify either explicit or implicit mention of IPD barriers. The SLR identified 222 barriers to IPD globally. The barriers were grouped into themes and separated as primary codes. The themes include Legal, Financial, Technological, Cultural/Organisational, Collaboration and Communication, and Governmental/Political. The barriers are displayed using VOSViewer to visualise the co-occurrence of factors. The implications of this research will aid researchers and industry practitioners in understanding existing barriers comprehensively and identifying the most frequent barriers to IPD for sustainable construction in the global context.

Keywords: Integrated project delivery; challenges; barriers; obstacles

PDF

Download
To top